Professional Construction Estimation Tool
Parameter | Value | Unit | Output (Cost) |
---|---|---|---|
Running Meters of Wall | m |
Stud Type: 64mm .75 STUD
Cost per meter: $ Total Linear Meters: 0m Steel Weight: 0kg Your Cost: $0.00 Customer Charge: $0.00 Calculation FormulasNumber of Studs: (Wall Length × 1000 ÷ Stud Centers) + (Wall Length ÷ 3) Stud Length: Number of Studs × Wall Height Plate Length: Wall Length × (2 + Additional Plates) Total Linear Meters: (Stud Length + Plate Length) × Wastage Factor × 1.4 (40% extra for openings) Total Weight: Total Linear Meters × Steel Weight per Meter Total Cost: Total Linear Meters × Cost per Meter Step-by-Step Calculation with Your ValuesEnter values above to see detailed calculations |
|
Wall Height | m | ||
Additional Top/Bottom Plates | plates | ||
Wastage Factor | multiplier |
Parameter | Value | Unit | Output (Cost) |
---|---|---|---|
Floor Area | m² |
Joist Type: 89mm .75 STUD
Cost per meter: $ Floor Area: 0m² Steel Weight: 0kg Your Cost: $0.00 Customer Charge: $0.00 Calculation Formulas:Number of Joists: (Floor Area ÷ Span Length) × (1000 ÷ Joist Spacing) Joist Linear Meters: Number of Joists × Span Length Bearer Linear Meters: (Floor Area ÷ Span Length) × Bearer Factor Total Linear Meters: (Joist Linear Meters + Bearer Linear Meters) × Wastage Factor Total Weight: Total Linear Meters × Steel Weight per Meter Total Cost: Total Linear Meters × Cost per Meter Step-by-Step Calculation with Your ValuesEnter values above to see detailed calculations |
|
Joist Span Length | m | ||
Bearer/Header Factor | multiplier | ||
Wastage Factor | multiplier |
SKILLION ROOF TRUSS SYSTEM
Parameter | Value | Unit | Output (Cost) |
---|---|---|---|
Wall Length (for truss spacing) | m |
Suggested Trusses: 0 (Wall Length ÷ Truss Spacing + 2)
Truss Steel: 89mm .75 STUD Batten Type: 40mm .55 ROOF BATTENS Wall Length: 0m Steel per Truss: 0 m Total Batten Steel: 0 Number of Battens: 0 Total Weight: 0 Your Cost: $0.00 Customer Charge: $0.00 Calculation FormulasSuggested Truss Count: Floor(Wall Length × 1000 ÷ Truss Spacing) + 2 Maximum Height: Min Height + (Bottom Chord × tan(Pitch in radians)) Top Chord Length: Bottom Chord ÷ cos(Pitch in radians) Web Members: Calculated based on truss geometry and spacing Steel Per Truss: Bottom Chord + Top Chord + Total Web Length Wall Length: The length of wall where trusses will be installed Number of Batten Runs: (Top Chord Length × 1000) ÷ Batten Spacing Batten Linear Meters: Number of Batten Runs × Wall Length × Wastage Number of Battens: Ceiling(Batten Linear Meters ÷ Batten Length) + 5 (extra battens) Total Weight: Truss Steel × Steel Weight Total Cost: (Truss Steel × Steel Cost) + (Number of Battens × Batten Cost) Step-by-Step Calculation with Your ValuesEnter values above to see detailed calculations Step-by-Step Calculation with Your ValuesEnter values above to see detailed calculations |
|
Number of Trusses | trusses | ||
Room Width + Eaves (Bottom Chord) | m | ||
Roof Pitch | degrees | ||
Minimum Vertical Height | m | ||
Truss Spacing | mm | ||
Batten Spacing | mm | ||
Number of Web Members per Truss | members | ||
Wastage Factor | multiplier |
Total Number of Trusses: 0
Average Steel per Truss: 0 m
Total Wall Length: 0 m
Total Batten Steel: 0 m
Total Number of Battens: 0
Total Weight: 0 kg
Your Cost: $0.00
Customer Charge: $0.00
Web members are the diagonal supports inside each truss. Here's how they're calculated:
This calculation ensures proper structural support while optimizing material usage.
Wall Length (for truss spacing) | m |
Suggested Trusses: 0 (Wall Length ÷ Truss Spacing + 2)
Truss Steel: 89mm .75 STUD Batten Type: 40mm .55 ROOF BATTENS Wall Length: 0 m Steel per Truss: 0 m Total Batten Steel: 0 m Number of Battens: 0 Total Weight: 0 kg Your Cost: $0.00 Customer Charge: $0.00 Calculation Formulas:Suggested Truss Count: Floor(Wall Length × 1000 ÷ Truss Spacing) + 2 Maximum Height: Min Height + (Bottom Chord × tan(Pitch in radians)) Top Chord Length: Bottom Chord ÷ cos(Pitch in radians) Web Members: Calculated based on truss geometry and spacing Steel Per Truss: Bottom Chord + Top Chord + Total Web Length Wall Length: The length of wall where trusses will be installed Number of Batten Runs: (Top Chord Length × 1000) ÷ Batten Spacing Batten Linear Meters: Number of Batten Runs × Wall Length × Wastage Number of Battens: Ceiling(Batten Linear Meters ÷ Batten Length) + 5 (extra battens) Total Weight: Truss Steel × Steel Weight Total Cost: (Truss Steel × Steel Cost) + (Number of Battens × Batten Cost) Step-by-Step Calculation with Your ValuesEnter values above to see detailed calculations |
|
Number of Trusses | trusses | ||
Room Width + Eaves (Bottom Chord) | m | ||
Roof Pitch | degrees | ||
Minimum Vertical Height | m | ||
Truss Spacing | mm | ||
Batten Spacing | mm | ||
Number of Web Members per Truss | members | ||
Wastage Factor | multiplier |
This section allows you to add extra materials to your quote. The calculation is straightforward:
The weight calculation for additional materials follows the same principle:
These additional materials are added to your total project cost and weight in the summary.
Steel Type | Cost per Meter (or Each) | Quantity Required | Total Cost |
---|---|---|---|
TEC SCREWS - Box of 1000 (12g x 50mm) | $0.00 | $0.00 | |
TEC SCREWS - Box of 1000 (12g x 65mm) | $0.00 | $0.00 | |
TEC SCREWS - Box of 1000 (12g x 75mm) | $0.00 | $0.00 | |
DYNABOLTS - Box of 50 (M12 x 100mm) | $0.00 | $0.00 | |
RAMSET PINS - Box of 100 (3.7 x 27mm) | $0.00 | $0.00 | |
GALVANISED BOLTS - Box of 50 (M12 x 150mm) | $0.00 | $0.00 | |
WASHERS - Box of 100 (M12 Galvanised) | $0.00 | $0.00 | |
NUTS - Box of 100 (M12 Galvanised) | $0.00 | $0.00 | |
STEEL BRACKETS - Joist Hangers (Pack of 10) | $0.00 | $0.00 | |
ANGLE BRACKETS - 90° Corner (Pack of 20) | $0.00 | $0.00 | |
HOLD DOWN BRACKETS - Tie Down (Pack of 10) | $0.00 | $0.00 | |
GALVANISED NAILS - 20kg Box (75mm Bullet Head) | $0.00 | $0.00 | |
GALVANISED NAILS - 20kg Box (100mm Bullet Head) | $0.00 | $0.00 | |
ADHESIVE SEALANT - Tube (Structural Grade) | $0.00 | $0.00 | |
INSULATION TAPE - Roll (50mm x 20m) | $0.00 | $0.00 | |
TOTAL ADDITIONAL MATERIALS | $0.00 |
Your Cost: $190 per hour | Charge to Customer: $200 per hour (depot to depot, including loading/unloading)
The delivery cost is calculated based on the following formulas:
The number of loads is determined by:
This calculation includes loading/unloading time and is measured depot to depot.
Parameter | Value | Output |
---|---|---|
Minimum Loads (Based on Project Type) | 0 |
Total Delivery Hours: 0.00 hrs
Your Delivery Cost: $0.00 Customer Charge: $0.00 |
Actual Number of Loads | ||
Cost Rate Per Hour | $190.00 | |
Customer Charge Rate Per Hour | $200.00 |
The weight calculations in this estimator are based on the following formulas:
The weight per meter for each steel type is defined in the material data and varies based on the steel profile and thickness. For example:
For battens, the weight is calculated per 6m length rather than per meter.
The cost calculations in this estimator are based on the following formulas:
The selling price is calculated using the profit margin formula:
Component | Your Cost | Min Sale Price (25% Profit) | Selling Price (Custom Profit) | Profit (Custom Profit) |
---|---|---|---|---|
Wall Frames | $0.00 | $0.00 | $0.00 | $0.00 |
Floor Joists | $0.00 | $0.00 | $0.00 | $0.00 |
Roof Trusses | $0.00 | $0.00 | $0.00 | $0.00 |
Roof Battens | $0.00 | $0.00 | $0.00 | $0.00 |
Additional Materials | $0.00 | $0.00 | $0.00 | $0.00 |
Delivery | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
Service | Your Cost Price | Selling Price | Include in Quote | Total |
---|---|---|---|---|
Structural Certificate of Compliance | $ | $560.00 | $0.00 |
Service | Your Cost Price | Selling Price | Include in Quote | Total |
---|---|---|---|---|
Slab Design | $ | $630.00 | $0.00 | |
Soil Report Analysis | $ | $490.00 | $0.00 |
Service | Your Cost Price | Selling Price | Include in Quote | Total |
---|---|---|---|---|
Geotechnical Services | $ | $1050.00 | $0.00 | |
Compaction Reports | $ | $490.00 | $0.00 | |
Piling Design/Reports | $ | $210.00 | $0.00 | |
Retaining Wall Design | $ | $910.00 | $0.00 |
Note: All service fees are quoted per project and exclude GST unless otherwise stated. Services will be invoiced separately upon completion.
Date:
Quote Valid Until:
Project Type:
Item Description | Quantity / Units | Unit Price (Ex GST) | Line Total (Ex GST) |
---|
Subtotal (Ex GST): $0.00
GST (10%): $0.00
Total (Inc GST): $0.00
Thank you for the opportunity to provide this quote. Please do not hesitate to contact us if you have any questions.